Thornhill Executive Residential
Location: | Thornhill |
---|---|
Client: | Michael Vogler |
Project: | Reconstruct and correct previous contractor’s technical and structural deficiencies in luxury kitchen. Duration - 2 months |
Challenge: | Disassemble existing floor/ceiling structure to remove undersized beams, replace with new beams and re-install drywall while maintaining client safety and comfort |
Details:
- Replace under-sized structural beams for 600 sq. foot, open-concept kitchen
- Employ engineer to re-calculate beam requirements
- Successfully manage safety, risk and quality aspects of construction to support 2nd floor of this 12,000 sq. foot home
“Burlmann remedied the serious structural problems skilfully and safely, with minimal disruption and respect for our comfort. Whatever task we asked the team to take on, it was done with a desire to meet the challenge, complete it knowledgeably and to our 100% satisfaction.”
Michael Vogler, President